Heading to work the NS interchange in Three Bridges, 0846 hours, iron truss bridge over the South Branch of the Raritan River on the ex-CNJ Flemington Branch, which ran from Flemington to Somerville, where it connected to the CNJ main line. The stretch from Three Bridges to Somerville has long since been dismantled. |