First trials with the Brenner-locos, as they were called in these days, started late in 1997. The E 412s are three-tension locomotives for 1,5kV (although with reduced power) and 3 kV DC combined with 15kV AC. Two E412 hauling a truck train with sleeping coach for truckdrivers towards Brennero Austrian border station. |