A Cope Load is notched out in the Creson Block. Earlier in the day he stalled on Wedgefield Hill on the Eastover Sub and was pushed by F750 to Cane Savannah Block. |
Date:
7/20/2004 |
Location:
Cameron, SC |
Views:
713 |
Collection Of:
John Wienges |
Locomotives: |
Author: John Wienges
|
|
Picture Categories: |
This picture is part of album: Restored Album |