Note to editor: UP 8086 Locomotive category needs to be fixed. While expecting two Southbounds which did not pass until after dark, this unexpected Northbound was a very pleasent surprise. The leader UP 8086 is a brand new heavy c45ah built in 2013 specifically for the I-5 corridor, they are 8 tons heavier then the standard es44ac which is intended to help fix the problem of trains stalling on the hill out of Oakridge. |