Stone Arch culvert under new alignment         
B&O’s Old Main Line sub has always been noted for tight curves, grades & tunnels. The early 20th century realignment resulted in more tunnels and fills to minimize difficult curves and speed traffic. In the areas I’ve explored on the eastern side of the grade up to Mount Arey the railroad is a real work of art. All along the river valley old grade alighments consiting of fills, cuts, & bridge abutments abound. They tell an interesting story when especially whem compaired with the new alignment with longer and higher fills wider cuts resulting in shallower curves and newer stone culverts. /DL
Date: 4/26/2015 Location: Marriottsville, MD Views: 159 Collection Of:   David Larrabee
Rolling Stock: CSX 243458 (Covered Hopper) Author:  David Larrabee
Stone Arch culvert under new alignment
Picture Categories: Track This picture is part of album:  CSX The Old Main Line Sub
Share
User Comments
Name Type Comments Date
David Nutter General Nice shot! 5/12/2015 6:07:44 PM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4177068