Quality Assembly and Logistics / KK Integrated Logistics         
Two businesses share this sheet metal industrial building in Marinette. The spur runs along Woleske Road to allow this switch back into the building. The spur starts just south of Cleveland Avenue and takes a fairly sharp curve off the former CNW (now CN) line.
Date: 9/6/2015 Location: Marinette, WI   Map Show Marinette on a rail map Views: 173 Collection Of:   Richard Hopfensperger
Author:  Richard Hopfensperger
Quality Assembly and Logistics / KK Integrated Logistics
Picture Categories: Track This picture is part of album:  Odds and Ends
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4555273