MV 152         
Date: 2/1/1958 Location: Bokoshe, OK Views: 191 Collection Of:   David Krebs
Locomotives: MV 152(GP7)    Author:  H.E.Huber
MV 152
Picture Categories: Roster,Wreck This picture is part of album:  The Midland Valley wreck Bokoshe,OK 2/1/58
Share
User Comments
Name Type Comments Date
David Krebs General A fatal accident occured on the Midland Valley at Bokoshe, Oklahoma on 1 Feb 1958. The Midland Valley ran from Wichita to the vicinity of Fort Smith, and was operated in three subdivisions, Western, Middle and Eastern. The Eastern Subdivision ran from Muskogee to Fort Smith, with entry to Fort Smith over 15.4 miles of joint track with the Frisco. This was a single track, operated by time table and train order, with day offices at Porum, Stigler, Panama and Rock Island. The office at Muskogee was open continuously, since the dispatcher was located here at the headquarters of the company. Trains originated at Shopton, 1.1 miles east of Muskogee, but called for orders at Muskogee. The speed limit was 30 mph. 8/1/2021 11:27:36 AM
Randy Curlin General wow 8/2/2021 3:45:49 AM
Steve Coraggio General Very interesting shot of the wreck and your excellent Comment !! 8/2/2021 8:18:57 AM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5593046