CVSR 365  Contributor's Pick!       
I was told the the 365 was needing to get her 92 day inspection done. I imagine that's the reason why it wasn't;t put in the lead for the trip north.
Date: 8/7/2023 Location: Akron, OH   Map Show Akron on a rail map Views: 44 Collection Of:   Fred Stuckmann
Locomotives: CVSR 365(API620A)    Author:  Fred Stuckmann
CVSR 365
Picture Categories: Passenger,Action This picture is part of album:  ABC uses Wheeling power to deliver CVSR 365.
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=6110624