Note the progress on the CTC installation here. The signals are up and the insulated joints are installed. The one right beside the loco hasn't been welded into place, but the one on the extreme lower right has been welded into place |
Date:
3/10/2007 |
Location:
Waterloo, SC Map |
Views:
558 |
Collection Of:
Tim Huemmer |
Locomotives: |
Author: Tim Huemmer
|
|
Picture Categories: Signal,Action |
This picture is part of album: 2007 CSX Spartanburg Sub |